Reference Type | Journal (article/letter/editorial) |
---|
Title | Two-Machine Flexible Flow-Shop Scheduling with Setup Times |
---|
Journal | Journal of Applied Sciences |
---|
Authors | Cheng Lo, Ming- | Author |
---|
Shiang Chen, Jen- | Author |
Fu Chang, Yong- | Author |
Year | 2008 (December 1) | Volume | 8 |
---|
Publisher | Science Alert |
---|
DOI | doi:10.3923/jas.2008.2217.2225Search in ResearchGate |
---|
| Generate Citation Formats |
Mindat Ref. ID | 10340088 | Long-form Identifier | mindat:1:5:10340088:6 |
---|
|
GUID | 0 |
---|
Full Reference | Cheng Lo, Ming-, Shiang Chen, Jen-, Fu Chang, Yong- (2008) Two-Machine Flexible Flow-Shop Scheduling with Setup Times. Journal of Applied Sciences, 8. 2217-2225 doi:10.3923/jas.2008.2217.2225 |
---|
Plain Text | Cheng Lo, Ming-, Shiang Chen, Jen-, Fu Chang, Yong- (2008) Two-Machine Flexible Flow-Shop Scheduling with Setup Times. Journal of Applied Sciences, 8. 2217-2225 doi:10.3923/jas.2008.2217.2225 |
---|
In | (n.d.) Journal of Applied Sciences Vol. 8. Science Alert |
---|
These are possibly similar items as determined by title/reference text matching only.